top of page

RAILWAY PROJECTS

Dubai Metro Image copy.png
Valley Metro-Phoenix copy.png
Sound Transit copy.png
Route N8 project.png
Saudi Minna Mecca light rail copy.png
Ehtiopia Djibouti RW copy.png
BD Pic.png
Ethiopia Pic.png
Sri Lanka.png

ECM – RTC

DUBAI METRO [Dubai, EAE]

44 – 5 Car Metro Trains
Number of Stations: 49
System Length: 74.6 km
Project Cost: $7.8 Billion
Provided following services:
  • Systems Integration Engineering
  • Qualification Testing EMC to EN 50121
  • Rolling Stock EMC/EMI Program Management
  • Rolling Stock Systems Assurance Vehicle Program
  • Subcontractor RAMS Integration (RMS) EN 50126
  • Operation and Maintenance Manual Preparation

VMR – VALLEY METRO RAIL [Phoenix, AZ]

50 Low Floor Light Rail Vehicles
Number of Stations: 38
System Length: 45 km
Project Cost: $1.4 Billion
Provided following services:
  • Systems Integration Engineering
  • Qualification Testing
  •  Data Acquisition System Design
  • Qualification Test Performance
  • Sound Level, Vibration & Ride Quality Testing
  • Rest Reporting
  • Proposal Preparation and Bidding Support
  • Rolling Stock Systems Assurance Vehicle Program
  • Systems Assurance (RMS)
SOUND TRANSIT EXPANSION [Seattle, WA]
55-70% Low Floor Light Rail Vehicles
Number of Stations: 22
System Length: 35 km
Project Cost: $54 Billion
Provided following services:
Systems Integration Engineering
Qualification Testing
Data Acquisition System Design
Qualification Test Performance
Sound Level, Vibration & Ride Quality Testing
Rest Reporting
Proposal Preparation and Bidding Support
Rolling Stock Systems Assurance Vehicle Program
Systems Assurance (RMS)
 
ECM – RTC– CRCC16
N8 ROAK EXPANSION PROJECT [Bangladesh]
Employer: Special Works Organization-West, Bangladesh Army
Contract Price: 2.2 billion BDT
Commencement Date: June 1,2017
Completion Date: September 25,2019
Project Location: Shibchar District – Madaripur,Dhaka,Bangladesh
Description: The project consists of 55,000 square meters of roadbed filling and 15,000 square meters of roadbed excavation, One 466.67m-long prefabricated bridge across the river. The total length is 0.68km.
MECCA LIGHT RAIL [Saudi Arabia]
Total length of 18.25 km, including 13.36 km bridge and 4.71 km embankment and 9 stations
The project was opened in November 2010. Project Cost: $1.8 Billion
DJIBOUTI RAILWAY: OPERATION & MAINTENANCE PROJECT [Ethiopia]
The contract sum is up to nearly $180 million, and its design speed for the passenger train is 120 km/h, goods train is 80 km/h. CRCC16 is responsible for the implementation of the project, leading the technology, security and operation management. The project was operated in 2018 by CRCC16
 
ECM – RTC– RITES
BANGLADESH PROJECT
The consortium secured a major export from Bangladesh Railways for the supply of 120 BG stainless steel passenger coaches and executed a contract for supply of 26 new BG diesel locomotives
ETHIOPIA PROJECT
The consortium has successfully completed the work of Detailed Project Report for a new Railway Line
SRI LANKA PROJECT
The consortium along with IRCON has completed projects of updating of Coastal Railway line in Southern Sri Lanka and reconstruction of railway line in Northern Province
of Sri Lanka valuing total of $730 Million.
bottom of page